Treasure Pools has kicked off phase II of the amazing West Palm Beach project. Last month we talked about the construction portion and now we move onto the next phase. By this point, the groundwork is laid and it’s only a matter of time until the whole backyard is complete!
Currently, the plumbing has been completed along with the footers. As we mentioned before, this swimming pool going to be a beautiful one. These homeowners have pulled out all the stops. For equipment, the final additions have been installed with the latest and greatest in technology. Taking care of and maintaining this swimming pool will not be a problem with the seamlessness of the technology throughout the project.
For next steps, the gorgeous travertine marble deck will be installed. This was handpicked by the homeowners and will offer a stunning finish. Once the deck is complete, it is time for the final touches. This pool will have a euro edge, which will be made with customized tile. From there, the final call for inspection will be made and once completed the pebble tec finish will be installed. Pebble tec is a great luxurious option to finish off this incredible job.
Our Treasure Pools team can’t wait to show you the final pictures of this stunner! Check back for more.